irse
irse
Home | Profile | Register | Active Topics | Active Polls | Members | Private Messages | Search | FAQ

 All Forums
 IRSE Discussion Forum
 Railways in News- Metro
 Kochin Metro

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Enter Anti SPAM Code: Please enter this code in the box below. If you cannot read it refresh the page. Click here for more detailed instructions.Play Sound
Click here to refresh this page
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List Insert youTube videoInsert Windows Media AudioInsert Windows Media VideoInsert Macromedia FlashInsert Google Video
   
Message Icon:              
             
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
irse Posted - 07/07/2008 : 04:35:32
http://news.webindia123.com/news/ar_showdetails.asp?
id=807070277&cat=&n_date=20080707

Thiruvananthapuram | Monday, Jul 7 2008

Kerala Sports and Youth Affairs Minister M Vijayakumar today told
State Assembly the total cost of the proposed Metro Rail at Kochi was
expected to be Rs 3,084 crore.

In a written reply to Mr Joseph M Puthuseerry of Kerala Congress (M)
and others, he said the State and the Centre would each invest 15 per
cent of the total cost and the remaining would be raised as loan from
the Japan Bank of International Corporation (JBIC) Stating the total
length of the Metro Rail would be 25.253 km, which would be
constructed between Aluva and Thripunithura, he said the Delhi Metro
Rail Corporation would be the implementing authority.

Work would start immediately after the government received the
approval from the Planning Commission and the Centre. The Minister
also said the government had urged the Centre for a High-Speed
Corridor connecting IT and Port cities in South India and the request
was under the consideration of the Union Government.



irse
15   L A T E S T    R E P L I E S    (Newest First)
S.ravi Posted - 11/13/2009 : 20:35:36
Kochi : Metro project
http://www.hindu.com/2009/11/13/stories/2009111354100500.htm

Kochi: The Union government on Thursday informed the Kerala High Court that the Kochi metro rail project was still under the consideration of the government.

In an affidavit, the Union Ministry of Urban Transport Department said the proposal had been considered at various levels. But the Union government was yet to accord its final approval to the proposal. The affidavit was filed in response to a writ petition seeking to restrain the State government from spending any amount towards the project without the prior approval of the Union government.
irse Posted - 10/31/2009 : 01:14:53
Environmental gain from metro rail

http://www.hindu. com/2009/ 10/31/stories/ 2009103156210300 .htm

KOCHI: The Kochi metro project, planned on the Delhi metro model, will have a low-carbon operation, similar to the latter. According to a report brought out by the World Institute of Sustainable Energy, Pune, a couple of eco-friendly measures adopted by the Delhi metro project have contributed immensely to the clean operational status. The Delhi metro is the first railway project in the world to be registered for carbon credits by the United Nations. The Delhi Metro Rail Corporation has been certified to have prevented the release of over 90,000 tonnes of carbon dioxide into the atmosphere during 2004 to 2007.

The certification was done by the Germany-based organisation, Tuvnord.

Braking system

The emission reduction was effected through the regenerative braking system. Whenever the brakes of any of the trains are applied, the three-phase traction motors installed on the trains act as generators to produce electricity, which is sent back to the overhead power lines.

The power is used by other trains in the same line. The Kochi metro rail project is yet to get clearance.

The transport facility apart, one of the most important features of the metro rail project which has been overlooked by the planners is the benefit derived from the low-carbon advantage.


Rajendra Saxena
S.ravi Posted - 10/27/2009 : 19:36:45
Minister rules out Delhi model for Kochi metro
http://www.hindu.com/2009/10/27/stories/2009102761440300.htm

KOCHI: The Kochi metro railway project cannot be implemented along the lines of the Delhi metro where the Central government had a major stake, said Vayalar Ravi, the Union Minister for Overseas Indians Affairs, here on Monday.

Taking part in the meet-the-press programme organised by the Ernakulam Press Club, Mr. Ravi said the Central government supported the Delhi project as it was implemented in the national capital. The Prime Minister himself had made the stand clear to the Kerala Chief Minister and the Railway Ministers when they met him earlier, Mr Ravi said.

The Central government had cleared the Kochi project and the last UDF government in the State had even invited the Expression of Interest for its implementation.The process was stalled following the announcement of the election.

Yet, the State Railway Minister M. Vijayakumar alleged that the Centre had not cleared the project.

vThe LDF government could not take the project further, he said.

However, the allegations of Mr. Vijayakumar that the Centre had not cleared the project were wrong and politically motivated, he said.

The LDF government wanted the project to be implemented with the support of the Central government. The cities which have opted for metro railway projects were implementing them on their own.

The Central government will have to consider the country as a whole and cannot support Kerala alone for the implementation of the metro project, Mr. Ravi said.

The State government should initiate discussions on the mode in which the project can be implemented, he said.


S.ravi Posted - 10/25/2009 : 19:07:54
Metro: team to meet Pranab


Centre neglecting State, says Law Minister M. Vijayakumar

State not in favour of public-private partnership for metro project

State has opened project office for Metro, allotted Rs. 50 lakh

KOCHI: The delay in clearing the Kochi Metro project is an example of the Centre’s neglect towards Kerala, said M. Vijayakumar, Minister for Law and Railways.

Though the project could be cleared in a week’s time, the Central authorities were inventing some reason or the other for delaying it. The State government will put pressure on the Central government for getting it cleared, said Mr. Vijayakumar while participating in the meet-the-press programme organised by the Ernakulam Press Club here on Sunday.

Mr. Vijayakumar said that a State delegation would meet the Union Finance Minister Pranab Mukherjee for obtaining the clearance of the Cabinet Committee for Economic Affairs for the Kochi project. The support of the Union Defence Minister A. K. Antony and the Union Minister of State for Agriculture, K.V. Thomas has also been sought for pressing the demand of the State, he said.

The State government has completed the preliminary measures for the implementation of the project including the opening of a project office in Kochi and allotting Rs. 50 lakh for completing the groundwork.

The National Highway Authority of India had recently cleared the proposal for setting up overbridges along the National Highway for the project.

However, the clearance of the central government was required for starting the work, he said.

The government is of the view that the project should be implemented along the lines of the Delhi metro railway project with the involvement of the State and the Central governments. The Kerala government is not in favour of the Private Public Participation mode suggested for the project.

Thought the Kochi metro may not be a financially viable project during the initial years, it will breakeven later. The central government needs to consider the development requirements of the Kochi with a futuristic view, he said.

E. Sreedharan, the chief of the Delhi Metro Railway Corporation, the implementing agency for the Kochi project, has stated that the project could be completed in three years, he said.
‘Food quota cut’

The United Progressive Alliance government at the Centre was cruelly neglecting the State by reducing its food grain quota and signing the ASEAN agreement, he said.

The Central government slashed the food grain quota unannounced. It didn’t even bother to send a notice to the Kerala government in this regard.

The statement of Union Minister Prof. Thomas that the State was not lifting the grain quota was a technical issue and the quota needs to be restored, he said.
S.ravi Posted - 07/09/2009 : 19:48:02

Metro rail requires 25.3 hectares of land
Allocation of funds to follow sanction for project

Land is required for depots, alignments, power substations and administrative buildings.




KOCHI: The allocation of funds for the metro project by the Union government will follow soon after it gets the official sanction, according to officials. The project has been included in the 100-day programme of the union government.

Land acquisition will have to be completed prior to construction. The project is to be taken up along the alignment planned by the Delhi Metro Rail Corporation, a detailed report of which has already been submitted to the government.

The land requirement for the Aluva-Petta corridor is about 25.33 hectares, out of which 9.37 hectares belongs to the government. Land is mainly required for depots, alignment on sharp bends, station buildings, platforms, power substations and administrative buildings.

The Aluva-Petta corridor is 25.25 km long and runs in north-southwest direction for 19 km length up to Ernakulam South station from where it turns towards east. Starting from a point about 70 metres from the southern end of the goods shed at Aluva railway station, the corridor runs parallel to the existing broad gauge tracks upto 1.4 km.

Thereafter the alignment starts rising and becomes fully elevated when it reaches the median of NH 47 at 1.66 km. From this point, the alignment runs along the median of NH 47 up to 10.85 km till Edapally.

After this, the alignment follows the Banerji Road upto 16.6 km. at Madhava Pharmacy Junction from where it turns towards MG Road to reach Jose Junction at 18.65 km. It turns from there towards Ernakulam South railway station up to 19.1 km.

The alignment then crosses Ernakulam South railway yard and enters SA Road at 19.6 km. From here, the alignment runs along SA Road upto 22.45 km to reach Vyttila. It crosses NH 47 bypass to enter NH 49 and reaches Petta at 24.83 km. The alignment finally terminates at 25.25 km.

The Metro station at Aluva will be located within the Aluva railway station near the existing goods shed. The private bus stand and the KSRTC bus stand are situated nearby. At Petta, the Metro station will be located near the road itself with a view to extending the line towards Thripunithura in future.

The stations have been proposed at a distance of about 1 km from one another. They are to be located at the following locations: Aluva, Companypady, Muttom, Apollo Tyres, Jacobite Church, Kalamasserry, Edapally Junction, Edapally, Palarivattom, Jawaharlal Nehru Stadium, Kaloor, Lissi Junction, Madhava Pharmacy, Maharaja’s College, Ernakulam South Station, GCDA, Fatima Church, Elamkulam, Vyttila, Thikkoodam and Petta.



S.ravi Posted - 07/09/2009 : 10:37:09
Kochi Metro Rail can be completed in 3 years: Official Message List




http://www.livemint.com/2009/07/08202558/Kochi-Metro-Rail-can-be-comple.html


The project, being implemented by the Delhi Metro has been delayed for the last three years but will now be included in the UPA’s 100-days programme

Kochi: The proposed Kochi Metro Rail Project could be completed in three years time once the Centre gives its sanction, Delhi Metro Rail Corporation (DMRC) chairman E Sridharan said on Wednesday.
The preliminary works in connection with the project, including land survey and station drawing, were going on, he said.
When pointed out that no fund had been earmarked for the Kochi metro rail project in the central budget, he said that would not be a problem. DMRC is the implementing agency for the project, which was proposed to be taken up as a Centre-state joint venture. It has been delayed for the last three years due to various reasons. The Planning Commission gave its green signal to the project recently and the Centre had decided to include the project in its 100-days programme.
The elevated metro rail, expected to ease the traffic congestion in the city, is to be constructed on the model of Delhi Metro.








S.ravi Posted - 07/05/2009 : 18:51:00

Kochi Metro likely to get budgetary support

DMRC may take up work on overbridges


Ministers from the State have requested budgetary provisions for the project

Construction of ROBs will get budgetary support from Railways, says Mr. Thomas


KOCHI: The Kochi Metro Railway project is likely to get budgetary support and an announcement is likely to be made in the budget to be presented in the Lok Sabha on Monday.

The Union Urban Development Ministry has also recommended that the Kochi project should be given financial aid.

The Ministry has also made some suggestions regarding the share the Central government should have in the project.

The Ministers from the State have requested that budgetary provisions should be made for the project, said K.V. Thomas, the Union Minister of State for Agriculture.

The Urban Development Ministry is also in favour of the project and the participation of the State and the Central governments in it, Prof. Thomas said.

Delhi Metro Railway Corporation (DMRC) has agreed to take up the construction of a Rail Overbridge (ROB) at Mullassery canal road in the city as part of the groundwork for the project.

The construction of the flyover at Atlantis may also be taken up by the DMRC. The work of the Pullepady Overbridge would be expedited.

Roundabout


The Kochi port is likely to take up the Pachalam roundabout work, Mr. Thomas said.

The construction of the ROBs will have to be completed before the commencement of the work of the Metro project so as to prevent any possible traffic snarls in the city. Senior officials of the DMRC held discussions with Prof Thomas in this regard on Saturday. The construction of the ROBs will get budgetary support from the Railway Ministry. The DMRC officials have said that the construction of the project would in no way affect the traffic flow, Mr. Thomas said.

Many traders and a section of the general public are apprehensive that the traffic along the busy city roads may be affected once the metro work begins.

The announcement that the Central government has included the Kochi metro railway project in the 100-day package has raised hopes that the wait for the rail-based mass rapid transport system would end soon. It was earlier reported that the Planning Commission had given its nod for the project to be implemented with the participation of the Central and State governments. The stake of the State government in the project and the final alignment of the route are some of the major decisions that need to be taken for carrying forward the project.

A section of the traders are outraged at the proposed route of the metro railway that passes through the MG road. They fear that such an alignment would lead to the end of the commercial and business establishments on the MG road, the business hub of the city.


S.ravi Posted - 07/04/2009 : 09:40:24

http://www.hindu.com/2009/07/04/stories/2009070452380300.htm

KOCHI: The Kochi metro railway project should be implemented strictly on the lines of the Delhi metro project, the State government has reiterated. Law Minister M. Vijayakumar has written to Prime Minister Manmohan Singh and Union Urban Development Secretary on Wednesday in this regard.

Mr. Vijayakumar said news reports that clearance was given to the project was misleading. He said what really happened was that the Planning Commission, which had earlier opposed the project, had now agreed to the proposal with certain conditions which were not acceptable to the State. He said it was the Cabinet Committee for Economic Affairs that had to clear the project. The Planning
Commission expressed its views when the files were sent to it, he said.The Centre had included the project in its 100 days programme and this had raised the hopes of city dwellers.






S.ravi Posted - 07/01/2009 : 18:54:40
State urged to finalise metro alignment




Corporation should have a say in management of the system: Deputy Mayor

--------------------------------------------------------------------------------

State authorities asked to address concerns

over the alignment of metro rail

Corporation all for the project, says Mayor


--------------------------------------------------------------------------------



KOCHII: The State government should take immediate steps for finalising the alignment of the proposed Kochi metro railway project, said K.V. Thomas, Union Minister of State for Agriculture.

The land acquisition process should be accelerated as the Central government has given the green signal for the project, said Prof. Thomas who represents Ernakulam in Parliament.

As a section of the traders and the general public have raised apprehensions about the project, the government should come forward for dispelling their doubts.

The support of the general public should also be ensured for the project. A mechanism for ensuring the timely completion of the project should also be put in place, he suggested.

The city is viewing the metro railway project as a solution to its perennial problem of traffic snarls.

The Central clearance for the project has come at a time when the civic body has decided to focus on improving the urban transport facilities. However, the corporation is yet decided on its role in the metro railway management system.

The civic bodies in the city including the corporation, the Greater Cochin Development Authority, the District Panchayat and some public sector companies had earlier jointly raised the funds for carrying out the preliminary study report of the project, said Deputy Mayor C.K. Manisankar.

It would be good if the corporation has a role in the management of the system as the Railway project is for the city, said Mr. Manisankar.

The corporation has not discussed its involvement in the project, said Mayor Mercy Williams.

It is mostly a Central project and the role of the State government in the new scheme is also unclear.

It has to be found out whether there would be a board for the management of the system.

The corporation council had earlier given the green signal for the project, she said. Meanwhile, it is understood that some of the traders along the route of the railway project have reached an understanding with the metro railway authorities regarding the space that has to be given for the project.

A section of the traders had opposed the alignment of the project and suggested that it should be taken along another route.

Bus service


The city authorities are planning to introduce a fleet of premium buses with the support of the Jawaharlal Nehru National Urban Renewal Mission. The primary intention of the bus service is to reduce the number of private vehicles coming into the city.

Though it has been announced that the bus service would begin by December, a consensus is yet to be reached among the various stakeholders of the project.

The Local Self Government Department and the Kerala State Road Transport Corporation are yet to reach an understanding regarding the management of the bus service. It is learnt that the KSRTC is keen on managing the new system on its own whereas the Local Self Government Department is opposed to such a move.

The Kochi Corporation, another stakeholder of the project, has made it clear that it should have a say regarding the fixing of bus routes in the city.








S.ravi Posted - 06/29/2009 : 18:20:02
Addressing a press conference here to unveil the 100-day Action Plan, Union Urban Development Minister S. Jaipal Reddy said the new criteria for allocation of funds under the JNNURM would qualify towns with a population of five lakh for funds, instead of the earlier 10 lakh population criteria. The move will add 28 new cities to the existing 65 cities.

Financial assistance


The metro project for Kochi would also be taken up for sanction soon.
S.ravi Posted - 06/15/2009 : 19:01:00

Centre to consider Kochi metro rail project



Decision on mode of implementation soon: Thomas





KOCHI: The Union Cabinet will soon consider the proposal for the Kochi Metro railway project, said K.V. Thomas, Union Minister of State for Agriculture.

Speaking at a reception organised by the District Congress Committee for the six newly elected Members of Parliament from the district, Prof. Thomas said a decision favourable to the State would be taken by the Cabinet.

He said the Planning Commission and the State government had different views regarding the mode of implementation of the project. A final decision on the implementation would be taken in consultation with all concerned, he said. At the same time, the State government should take a decision regarding the alignment of the metro railway project, he said.

S.ravi Posted - 06/15/2009 : 18:55:27


MPs urged to lobby for State




Thiruvananthapuram: Chief Minister V.S. Achuthanandan put the onus on new MPs and Union Ministers from the State to ensure that Kerala got its due from the Union government, especially in matters such as restoring the ration quota, the Kuttanad-Idukki packages and amendment of norms of Centrally sponsored programmes.

He wanted the MPs to pressure the Centre to clear the Kochi metro-rail project. The proposals had been held up owing to objections from the Planning Commission. Besides, the Centre should extend financial assistance to the State’s efforts to rehabilitate those returning from the Gulf and other countries owing to the economic downturn.



S.ravi Posted - 06/07/2009 : 09:15:14

http://www.expressbuzz.com/edition/story.aspx?Title=Centre+will+consider+proposal+on+Metro+Rail+project,+says+K&artid=HRPHb0BR1Z8=&SectionID=9R67TMeNb/w=&MainSectionID=9R67TMeNb/w=&SEO=Jawaharlal+Nehru+National+Renewable+Urban+Mission&SectionName=gUhH3Holuas=

07 Jun 2009 12:39:00 AM IST

KOCHI: Giving signs of co-operation between the State and Union governments on
infrastructure development in the State, Minister of State for Agriculture K V
Thomas said that the Central Government would take the State’s proposal on the
Metro Rail project into consideration.

Speaking to newsmen on the sidelines of a function in Kochi on Saturday, he said
that the project had been submitted before before the Union Cabinet.

One of the major hurdles faced by the project is the different views adopted by
the Planning Commission and the State Government. While the Planning Commission
stands for the project to be implemented on a public-private partnership basis,
the State Government wants the project to come up in the public sector. However,
the minister’s statement indicates that the project would be in the public
sector.

“I will not be able to say whether the project will be in the public sector or
not. The State Government’s stand will also be considered by the Central
Government. There are certain disputes over the alignment of the project”, he
said.Works Minister Mons Joseph, who was also present at the function, said that
the previous government at the centre had decided to wind up the flyover
projects in Kochi.

“Initially the flyovers were planned to be constructed as part of national
highway development.

Later, it was decided that the projects would be started under the Jawaharlal
Nehru National Renewable Urban Mission (JNNRUM).

But the project could not be started”, Mons Joseph said.

“But, now we expect that the present government at the centre, of which K V
Thomas is part, may respond to the projects to construct flyovers in Kochi in a
positive manner”, he said.

The proposals are for the construction of flyovers at Vyttilla, Palarivattom,
Edappally and Kundannoor.






S.ravi Posted - 06/07/2009 : 01:27:32

http://www.hindu.com/2009/06/07/stories/2009060761100500.htm

KOCHI: Union Minister of State for Agriculture, Food, and Civil Supplies, K.V.Thomas, has expressed confidence in clearing all hurdles hampering the progress of the proposed Kochi metro rail project and making it a reality.

Talking to reporters on the sidelines of a function held here on Saturday, Mr.Thomas said he had already held discussions with the Union Urban Development Secretary regarding the project. The file regarding the project was now before the Union Cabinet. The minister expected a decision in favour of the State on the project. Mons Joseph, the Minister for PWD, who accompanied Mr. Thomas, said
approach towards Kerala.

He said efforts would be made to meet the Union Minister for Road Transport Kamal Nath to present the State’s case on the issue.






S.ravi Posted - 05/23/2009 : 08:21:40

Renewed hope for Metro Rail

http://www.expressbuzz.com/edition/story.aspx?Title=Renewed+hope+for+Metro+Rail&artid=TtrDduNXyDY=&SectionID=9R67TMeNb/w=&MainSectionID=9R67TMeNb/w=&SEO=Kochi+Metro+Rail,+PPP,+Delhi+Metro+Rail&SectionName=gUhH3Holuas=

23 May 2009 11:24:00 PM IST

KOCHI: The initiative of the State Government to make the Kochi Metro Rail a reality has given a new hope for Kochiites.

The Cabinet on Friday decided to approach the Union Government to avail of loan
from the Japanese International Cooperative Agency for starting the work of the
Metro Rail. The ball is again in the court of the Central Planning Commission
who has to take a final decision on the request of the State Government to avail
the loan.

The Union Government is likely to forward the request to the Planning Commission to study the issue before going in for a negotiation with the Japanese Agency.
Earlier, the Planning Commission had raised objection to the project citing reasons that it is not viable.

The State Government has started an office in the city for initiating
preliminary work. Following the request from the Delhi Metro Rail Corporation the State Government had allotted Rs 50 crore for setting up the office here.

The approval from the Cabinet Committee on Economic Affairs is still pending and the land acquisition process can be started only after getting the approval.

The project can be materialised only after overcoming several hurdles.

The State Government had wanted to start the project as a joint venture between the State Government and the Union Government while the Centre suggested that the project be started on PPP basis. The issue has been resolved with the Union Government agreeing for a joint venture. The land to be acquired from Aluva to Pettah in Tripunithura was demarcated months ago but the survey on MG Road could
not be completed due to protests from merchants.

Once the project gets the go ahead nod from the Union Government it will be completed in four years.

According to a study conducted by the Delhi Metro Rail Corporation in 2005, there will be 13,000 passengers towards a single direction by 2010. This would go up to 24,000 by 2025, and only the Metro Rail envisaged for Kochi can meet this demand.






Sat May 23, 2009 10:46 am



irse © 2000-05 ForumCo.com Go To Top Of Page
This page was generated in 0.8 seconds. Snitz Forums 2000
RSS Feed 1 RSS Feed 2
Powered by ForumCo 2000-2008
TOS - AUP - URA
ForumCo Free Blogs and Galleries
Signup for a free forum or Go Banner Free